Module 27 of 49 · Part 4 – Gates, doors, windows and the house · About 8 minutes · Sources checked 17 November 2026
An open window is a doorway for a toddler.
Restrict windows that open from a building into the immediate pool area: the 2400 mm zone, a 1000 mm sill, a restrictor or a fixed screen – and lessons from a determination about a kitchen bifold window.
Read the module in the flip book below. The cover image is AI-generated and illustrative only. A short quiz is at the end of the module, with answers included.
On-screen flip book · 7 pages
Page 1 of 7
Key learning points
- Code: windows opening from a building into the immediate pool area must be constructed or positioned to restrict the passage of children (F9.3.4(b)).
- Which windows: F9/AS1 4.1.1 covers a window that can open above and within 2400 mm vertically of the immediate pool area.
- Three options (4.1.1): (a) lower edge of the opening at least 1000 mm above the inside floor, no projections underneath over 10 mm; (b) a restrictor so a 100 mm sphere can’t pass; or (c) a permanently fixed screen that a 100 mm sphere can’t pass.
- Determination 2017/045: a kitchen bifold window over a bench, with no self-closing latches or restrictors, did not comply.
Key terms
| Term | Meaning | Where |
|---|---|---|
| Openable window | A window that can open. | F9/AS1 4.1.1 |
| Restrictor | Device limiting how far a window opens. | 4.1.1(b) |
| Fixed screen | Permanently fixed cover over the opening. | 4.1.1(c) |
| 2400 mm zone | Windows above and within 2400 mm vertically of the pool area. | 4.1.1 |
Official references
| Document | Version | Used for |
|---|---|---|
| Building Code clause F9 | Version as at 15 January 2026; captured 29 Oct 2026 | F9.3.4(b) |
| MBIE Acceptable Solutions F9/AS1 & F9/AS2 | First Edition, effective 27 April 2017; captured 17 Nov 2026 | AS1 4.1.1 |
| MBIE Determination 2017/045 | Issued 21 June 2017; official PDF retrieved 17 Nov 2026 | Bifold window; cat door; decision |
Please read first. This guide is general information for learning only. It is not formal engineering, legal or compliance approval. Always check requirements with your Building Consent Authority or a qualified professional. Contact BlueHaven at support@bluehaven.nz.