Module 26 of 49 · Part 4 – Gates, doors, windows and the house · About 9 minutes · Sources checked 17 November 2026
Two hands, one high latch, and a door that remembers to close.
Check a door from the house into the pool area against F9/AS1 4.2: door type and width, self-closing or alarm, latch release height, the sign, and how closers and alarms must perform.
Read the module in the flip book below. The cover image is AI-generated and illustrative only. A short quiz is at the end of the module, with answers included.
On-screen flip book · 7 pages
Page 1 of 7
Key learning points
- Type: single leaf, not more than 1000 mm wide, side hinged or sliding (4.2.1).
- Closing: either a self-closing device or an audible alarm (4.2.2(a)), plus a self-latching device released manually (4.2.2(b)).
- Latch release: at least 1500 mm above the inside floor (4.2.2(c)).
- Sign: “SWIMMING POOL. CLOSE THE DOOR.” beside the inside handle, 1200–1500 mm high, black letters ≥ 5 mm (4.2.2(d)).
- Performance: hinged doors opening towards the pool self-close from any position; other doors from 150 mm open (4.2.3). Alarms: 75 dBAL10 at 3 m, starting 7 seconds after unlatching; low-battery warning; optional 15-second mute switch at ≥ 1500 mm (4.2.4–4.2.5).
Key terms
| Term | Meaning | Where |
|---|---|---|
| Self-latching device | Latches automatically when the door closes; released by hand. | 4.2.2(b) |
| Latch release | The part operated to unlatch; ≥ 1500 mm above inside floor. | 4.2.2(c) |
| dBAL10 | Sound level measure used for the alarm tone. | 4.2.4(a) |
| Deactivation switch | Mutes the alarm for up to 15 s; mounted ≥ 1500 mm. | 4.2.5 |
Official references
| Document | Version | Used for |
|---|---|---|
| MBIE Acceptable Solutions F9/AS1 & F9/AS2 | First Edition, effective 27 April 2017; captured 17 Nov 2026 | AS1 4.2.1–4.2.5 and Comment |
| Building Code clause F9 | Version as at 15 January 2026 | F9.3.4(a) |
Please read first. This guide is general information for learning only. It is not formal engineering, legal or compliance approval. Always check requirements with your Building Consent Authority or a qualified professional. Contact BlueHaven at support@bluehaven.nz.