Module 16: The non-climbable zone

Module 16 of 49 · Part 3 – Barrier essentials: F9/AS1 · About 10 minutes · Sources checked 17 November 2026

A child only needs one good foothold.

Keep the outside of a pool barrier free of footholds: the 1200 mm arc, projections and indentations, horizontal rails, and the 900 mm zone on boundary fences.

Read the module in the flip book below. The cover image is AI-generated and illustrative only. A short quiz is at the end of the module, with answers included.

On-screen flip book · 8 pages

Page 1 of 8

Key learning points

  • Code: a barrier must have no permanent objects or projections on the outside that could help children get over it (F9.3.3).
  • Arc: no ground features or objects outside within 1200 mm of the top of the barrier that would assist climbing (F9/AS1 2.1.6, Figure 2).
  • Projections: anything sticking out (or in) more than 10 mm on the outside face must be at least 900 mm apart vertically (2.1.7).
  • Rails: rails, rods or wires that are not vertical must be at least 900 mm apart vertically (2.1.3).
  • Boundary barriers also need a 900 mm climb-resistant zone on the pool side, starting within 150 mm of the top (2.2.1(d)).

Key terms

TermMeaningWhere
Projection / indentationAnything sticking out from, or recessed into, the outside face of the barrier.F9/AS1 2.1.7
Climbable objectA ground feature or object that would help a child climb.F9/AS1 2.1.6, Fig 2
Non-climbable zoneNZS 8500 term for the area that must be kept clear; F9/AS1 uses the 1200 mm test.NZS 8500 (not reviewed)
900 mm zoneClimb-resistant zone on the pool side of a boundary barrier.F9/AS1 2.2.1(d)

Official references

DocumentVersionUsed for
Building Code clause F9Version as at 15 January 2026; captured 29 Oct 2026F9.3.3
MBIE Acceptable Solutions F9/AS1 & F9/AS2First Edition, effective 27 April 2017; captured 17 Nov 2026AS1 2.1.3, 2.1.6, 2.1.7, 2.2, Figures 1–2
Auckland Council – “Pool area safety checklist”Web page, captured 17 Nov 2026Council inspection guidance
Please read first. This guide is general information for learning only. It is not formal engineering, legal or compliance approval. Always check requirements with your Building Consent Authority or a qualified professional. Contact BlueHaven at support@bluehaven.nz.
Scroll to Top