Module 13: Earthworks, trees, heritage and overlays

Module 13 of 49 · Part 2 – Consents and planning · About 11 minutes · Sources checked 17 November 2026

Digging the hole is permitted – until the site says otherwise.

Spot the Auckland Unitary Plan rules that can trigger a resource consent during the dig: earthworks thresholds, overlays, notable trees, flood plains and overland flow paths, and special character areas.

Read the module in the flip book below. The cover image is AI-generated and illustrative only. A short quiz is at the end of the module, with answers included.

On-screen flip book · 9 pages

Page 1 of 9

Key learning points

  • Pool earthworks are permitted in every zone: AUP E12 Table E12.4.1 (A1) and E11 Table E11.4.1 (A1) list earthworks for installing swimming pools as P.
  • Other site works aren’t automatic: regrading a garden is “general earthworks” – in residential zones, over 500 m² or over 250 m³ is restricted discretionary (RD).
  • Overlays tighten things: in overlays the pool row is missing – new pool earthworks fall into “not otherwise listed”, with thresholds as low as 5 m² / 5 m³.
  • General standards still apply to permitted earthworks – e.g. cleanfill only, limits on filling in flood plains, overland flow paths kept open.
  • Trees, floods, character: work in a notable tree’s root zone (D13), structures in flood plains or overland flow paths (E36), and new buildings in Special Character Areas (D18) are RD.

Key terms

TermMeaningWhere
Land disturbance / earthworksAltering land, e.g. excavation and filling.AUP E11, E12
OverlayA mapped layer adding extra rules on top of the zone.AUP Ch D
Protected root zoneCircle around a notable tree with radius = widest canopy reach.AUP J1
1% AEP flood plainLand expected to flood in a 1-in-100-year (1% annual chance) event.AUP E36
Overland flow pathRoute surface water follows when pipes are full.AUP E36

Official references

DocumentVersionUsed for
AUP E12 Land disturbance – DistrictPDF footer “July 2026”; downloaded 17 Nov 2026Tables E12.4.1, E12.4.2; E12.6.2
AUP E11 Land disturbance – RegionalPDF footer “July 2026”; downloaded 17 Nov 2026Table E11.4.1 (A1) (text only)
AUP D13 Notable Trees Overlay; J1 DefinitionsPDF footer “July 2026”; downloaded 17 Nov 2026Table D13.4.1; protected root zone
AUP E36 Natural hazards and floodingPDF footer “July 2026”; downloaded 17 Nov 2026Table E36.4.1 (A37)–(A42)
AUP D18 Special Character Areas OverlayPDF footer “July 2026”; downloaded 17 Nov 2026Table D18.4.1 (A5)
Please read first. This guide is general information for learning only. It is not formal engineering, legal or compliance approval. Always check requirements with your Building Consent Authority or a qualified professional. Contact BlueHaven at support@bluehaven.nz.