Module 10: PIMs and the building consent application

Module 10 of 49 · Part 2 – Consents and planning · About 10 minutes · Sources checked 17 November 2026

Find the site’s hidden problems on paper, before you find them with a digger.

What a project information memorandum (PIM) tells you about a site, when you get one, and what goes into a pool building consent application.

Read the module in the flip book below. The cover image is AI-generated and illustrative only. A short quiz is at the end of the module, with answers included.

On-screen flip book · 9 pages

Page 1 of 9

Key learning points

  • PIM = the council’s written summary of what it knows about the site that is relevant to your project – hazards, heritage, drains, other approvals.
  • Optional in Auckland: an owner may apply (s 32). The BCA only applies for one automatically when it is not also the territorial authority (s 31(2)(a)) – and Auckland Council is both.
  • Timing: a PIM is issued within 20 working days (s 34(1)(b)); the clock stops while the council waits for information it asked for.
  • Consent application: prescribed form, plans and specifications (s 45). The BCA decides within 20 working days, paused by requests for information (s 48).
  • For pools: Auckland’s AC1011 checklist has a whole pool and pool-fencing section, including the AC2344 producer statement cover sheet.

Key terms

TermMeaningWhere
PIMProject information memorandum – site information relevant to proposed building work.ss 31–35
Special feature of the landIncludes potential natural hazards and likely hazardous contaminants.s 35(2)
Working dayAny day except weekends, listed public holidays, the provincial anniversary day, and 20 December – 10 January.s 7
RFIRequest for further information – suspends the 20-day clock.s 48(2)
AC1011 / AC2344Auckland Council residential lodgement checklist / pool barrier PS cover sheet.Council forms

Official references

DocumentVersionUsed for
Building Act 2004, legislation.govt.nzVersion as at 8 Oct 2026 (re-checked 17 Nov 2026)ss 31–35, 45, 48
Auckland Council AC1011 Lodgement checklist – Residentialv.24, June 2026; downloaded 17 Nov 2026Pool section
Auckland Council AC2344 Producer statement cover sheet – pool fencing / barrierv.1, June 2017; downloaded 17 Nov 2026Barrier PS cover sheet
Auckland Council, “Apply for a consent to put in a residential or small heated pool”Captured 17 Nov 202620 working days; online only
Please read first. This guide is general information for learning only. It is not formal engineering, legal or compliance approval. Always check requirements with your Building Consent Authority or a qualified professional. Contact BlueHaven at support@bluehaven.nz.