Module 28 of 49 · Part 4 – Gates, doors, windows and the house · About 9 minutes · Sources checked 17 November 2026
Every building near the pool either helps the barrier or breaks it.
Plan pool houses, garages, sheds and side paths so the barrier still works – what can be inside the pool area, which walls and doors become part of the barrier, and why the pool area shouldn’t be a route.
Read the module in the flip book below. The cover image is AI-generated and illustrative only. A short quiz is at the end of the module, with answers included.
On-screen flip book · 6 pages
Page 1 of 6
Key learning points
- Pool houses can be inside the barrier only if their use relates to the pool and they are proximate to it. A large, multi-use pool house 6 m away was not (Determination 2023/024); a small changing-room outbuilding 1.2 m away was (2008/123, as summarised in 2023/024).
- Garages and sheds whose walls form part of the barrier bring their doors and windows under F9.3.4 – and their outside faces under the 1200 mm arc and projection rules.
- Roofs, eaves and lean-tos near the barrier can be climbing aids (F9/AS1 2.1.6).
- Side paths: using the pool area to reach the house or other parts of the property would in most cases conflict with the definition of immediate pool area (F9/AS1 2.1.1 Comment).
Key terms
| Term | Meaning | Where |
|---|---|---|
| Pool house | A building used with the pool – changing, storage, shade. | Determinations 2008/123, 2023/024 |
| Proximate | Close enough to the pool to be part of the immediate pool area. | 2023/024 paras 4.29–4.33 |
| Access route | Using the pool area to get somewhere else on the property. | F9/AS1 2.1.1 Comment |
| Building wall barrier | A building wall forming part of the pool barrier. | F9/AS1 2.1.1, 4.0 |
Official references
| Document | Version | Used for |
|---|---|---|
| MBIE Acceptable Solutions F9/AS1 & F9/AS2 | First Edition, effective 27 April 2017; captured 17 Nov 2026 | AS1 2.1.1 and Comment, 2.1.6–2.1.7, 4.1, 4.2 |
| MBIE Determination 2023/024 | Issued 25 August 2023; official PDF retrieved 17 Nov 2026 | Pool house; para 4.30 (summarising 2008/123) |
| MBIE Determination 2015/012 | Issued 27 May 2015 (former clause F4) | Access route |
Please read first. This guide is general information for learning only. It is not formal engineering, legal or compliance approval. Always check requirements with your Building Consent Authority or a qualified professional. Contact BlueHaven at support@bluehaven.nz.