Module 18: Rails, pickets, mesh and perforated panels

Module 18 of 49 · Part 3 – Barrier essentials: F9/AS1 · About 9 minutes · Sources checked 17 November 2026

Every rail is a step – unless the design says otherwise.

Know when horizontal members become footholds, how F9/AS1’s six barrier types work, how wire mesh is assessed, and what to do with perforated or decorative panels the Acceptable Solution doesn’t cover.

Read the module in the flip book below. The cover image is AI-generated and illustrative only. A short quiz is at the end of the module, with answers included.

On-screen flip book · 8 pages

Page 1 of 8

Key learning points

  • Six types: F9/AS1 Figure 1 shows six acceptable barrier constructions, (a) to (f) (2.1.4).
  • Rails: rails, rods or wires that are not vertical must be at least 900 mm apart (2.1.3) – unless the barrier is built as one of the Figure 1 types.
  • Mesh: square openings up to 13 mm can replace a solid panel; 13–35 mm needs a barrier at least 1800 mm high (2.1.5).
  • Outside face: projections and indentations over 10 mm must be at least 900 mm apart vertically (2.1.7).
  • Perforated panels are not mentioned in F9/AS1. Using one means an alternative solution that must be shown to meet F9.

Key terms

TermMeaningWhere
RailA horizontal (or non-vertical) member: rail, rod or wire.F9/AS1 2.1.3
UprightVertical member such as a picket.Figure 1
Steel wire meshMesh with square openings, assessed by side length.2.1.5
Alternative solutionA design that is not an Acceptable Solution but is shown to meet the Code.MBIE guidance (term)

Official references

DocumentVersionUsed for
MBIE Acceptable Solutions F9/AS1 & F9/AS2First Edition, effective 27 April 2017; captured 17 Nov 2026AS1 2.1.3–2.1.7, 2.4, Figure 1
Auckland Council – “Pool area safety checklist”Web page, captured 17 Nov 2026Mesh and trellis guidance (difference flagged)
MBIE – “Inspecting residential pools” (TA guidance)Web page, saved 17 Nov 2026“alternative solution” barriers and tailored check-sheets
Please read first. This guide is general information for learning only. It is not formal engineering, legal or compliance approval. Always check requirements with your Building Consent Authority or a qualified professional. Contact BlueHaven at support@bluehaven.nz.
Scroll to Top